Past Projects

Below are some of the projects Kaltron has done over the years:

 

Description of Project YEAR CLIENT VALUE OF PROJECT
Joint Venture: Kaltron - Inenzo Water JV
Tender: WS9/2004

Design, Supply, Delivery, Installation, Testing,
Commissioning and Upholding during the operational
acceptance and maintenance periods of Five VFC Drives
for Pumps and Associated Electrical Equipment Works
including PLC (4 off) and SCADA system for the Voëlvlei
Low Lift Pump Station at the Voëlvlei Water Treatment
Plant.
2005 City of Cape Town R 16.7m
Joint Venture: Kaltron - Inenzo Water JV
Tender: WW7/2005
The removal of the Gas Engine and the replacement of
the Blower Gearbox, Motor and Electrical Equipment for
Athlone Wastewater Treatment Works
2005 City of Cape Town R 2.5m
Tender: TE 26 2006/2007- Inenzo Water Mechanical
Contractor

Worcester Wastewater Treatment Works, Electrical
Equipment for the Refurbishment of the Works, including
PLC’s (6), SCADA and Telemetry for Pump Stations (4) at
the Worcester Waste Water Works.
2007 Breede River Valley
Municipality
R 7.5m
Tender: WW1/2005 – Bio Water - Mechanical
Contractor

Design, Supply, Delivery, Installation, Testing,
Commissioning And Upholding During The Operational
Acceptance And Maintenance Periods Of Electrical
Equipment including PLC’s (5) and SCADA System For
Upgrading at Potsdam Wastewater Treatment Works.
2007 City of Cape Town R 12m
Tender: WW8/2007- Inenzo Water Mechanical
Contractor

Design, Supply, Delivery, Installation, Testing,
Commissioning and Upholding During the Trial
Operation Period and the Defect Notification Period of
Electrical Equipment including PLC and SCADA system
for Dewatering Facilities at the Athlone Wastewater
Treatment Works
2008 City of Cape Town R 1.5m
Tender: WW12/2008 - Inenzo Water Mechanical
Contractor

Design, Supply, Delivery, Installation, Testing,
Commissioning and Upholding During the Trial
Operation Period and the Defect Notification Period of
Electrical Equipment including PLC and SCADA
system for Upgrading the Dewatering Facilities at
Scottsdene Wastewater Treatment Works
2008 City Cape Town R 1.8m
Joint Venture: IKEWE Joint Venture
Inenzo Water – Kaltron – Exeo JV
Tender: WW6/2008

Design, Supply, Delivery, Installation, Testing,
Commissioning and Upholding During the Trial
Operation Period and the Defect Notification Period of
Electrical Equipment, including PLC’s (6 off) and
SCADA systems for the 22MI/d Fisantekraal
Wastewater Treatment Works.
2008/9/10 City of Cape Town R 11.2m
Tender: WW4/2008 - Inenzo Water Mechanical
Contractor

Design, Supply, Delivery, Installation, Testing,
Commissioning and Upholding During the Trial
Operation Period and the Defect Notification Period of
Electrical Equipment including PLC and SCADA
system for the Upgrading of the Sludge Dewatering
Facilities at Bellville Wastewater Treatment Works.
2008/9 City of Cape Town R 2.4m
Tender: CES 7/2008 - Inenzo Water Mechanical
Contractor

Electrical works for the Paarl Wastewater Treatment
Works Extension to 35 MI/d Capacity: Phase 1
2009 Drakenstein
Municipality
R 1.5m
Joint Venture: IKAD Joint Venture
Inenzo Water–Kaltron - Adenco
Tender: BV 45-2008/2009

Worcester Wastewater Treatment Works 20 MI/d
Extension: Design, Supply, Installation, Testing,
Commissioning and Upholding During the Trial
Operational Period and the Defects Notification Period of
the Electrical Plant and Equipment including PLC,
Telemetry and SCADA system for the Worcester Waste
Water works.
2009/10 Breede Valley Municipality R 11.7m
Tender: T/ING/022/2008 – Tricom Mechanical
Contractor

Design, Supply, Delivery, Installation, Testing,
Commissioning and Upholding During the Trial
Operation Period and the Defect Notification Period of
Electrical including PLC, HMI, Telemetry and SCADA
system for the George Pump Station1A.
2009/10 George Municipality R 5.1m
Tender: WR3/2007 - CSV Construction Main Contractor
Design, Supply, Delivery, Installation, Testing,
Commissioning and Upholding During the Trial
Operation Period and the Defect Notification Period of
Electrical including PLC, HMI, Telemetry and SCADA
system & Mechanical Equipment for the Helderberg,
Somerset West, Wastewater Pump Station.
2009/10 City of Cape Town R 6.2m
Joint Venture: Kaltron-Hidrotech Joint Venture
Tender: 64Q/2008/2009

Design, Supply, Delivery, Installation, Testing,
Commissioning and Upholding During the Trial
Operation Period and the Defect Notification Period of
Electrical including PLC, HMI, Telemetry and SCADA
system & Mechanical Equipment for the Fisantekraal,
Durbanville, Wastewater Pump Station.
2009/10 City of Cape Town R 33.2m
Kaltron-Partnership: Tender: PR/18/9/3/08 (iii) –
Hidrotech Mechanical Contractor

Design, Supply, Delivery, Installation, Testing,
Commissioning and Upholding During the Trial
Operation Period and the Defect Notification Period of
Mechanical Equipment & Electrical Equipment including
PLC, HMI, GPRS and SCADA systems & for the
Gaborone Wastewater Pump Stations (9off).
2010 Gaborone -Department
Of Waste Management
And Pollution Control
R 33m
Joint Venture: IKA Joint Venture: Inenzo Water–Kaltron
Tender: AUR 7/2010

Malmesbury Wastewater Treatment Works 20 MI/d Extension:
Design, Supply, Installation, Testing, Commissioning and
Upholding During the Trial Operational Period and the Defects
Notification Period of the Electrical Plant and Equipment
including PLC, Telemetry and SCADA system for the
Malmesbury Waste Water works.
2011 Swartland Municipality R 11.5m
Tender: AUR /011 - Hidrotech - Mechanical Contractor
Design, Supply, Delivery, Installation, Testing, Commissioning
and Upholding During the Trial Operation Period and the Defect
Notification Period of Mechanical Equipment & Electrical
Equipment including PLC, HMI, GPRS and SCADA systems &
for the Ohlanga Wastewater Pump Station.
2011 Ethetwini Municipality R 5.4m
Tender: Q454/2009/10 - Veolia Water- Mechanical Contractor
Design, Supply, Delivery, Installation, Testing, Commissioning
and Upholding During the Trial Operation Period of Electrical and
Electronic Equipment including PLC, HMI, and SCADA system
for the Bellville, Wastewater Works.
2010/14 City of Cape Town R 30m
Tender: WS6117 - Hidrotech - Mechanical Contractor
Design, Supply, Delivery, Installation, Testing, Commissioning
and Upholding During the Trial Operation Period of Mechanical
Equipment & Electrical Equipment including PLC, HMI, GPRS
and SCADA systems & for the Mahatma Gandi Wastewater
Pump Station.
2013/15 Ethetwini Municipality R 8.4m
Tender: Q135/2012/13
Design, Supply, Delivery, Installation, Testing, Commissioning
and Upholding During the Trial Operation Period of Variable
Speed Drives - 2 x 3.3kV 1550 kW for Firlands Pump Station.
2013/14 City of Cape Town R 6.8m
Tender: Q1/2013/14
Design, Supply, Delivery, Installation, Testing, Commissioning
and Upholding During the Trial Operation Period of Mechanical
and Electrical Equipment for Aeration Blowers for various
WWTW sites for City of Cape Town.
2014/15/16 City of Cape Town R 36m